Settle Intelligence
Settle helps teams win more RFP revenue by finding the right opportunities early, prioritizing the contracts they're most likely to win, and drafting responses from approved company knowledge and past wins.
Issue Date: June 15th, 2026
Questions Deadline: June 25th, 2026
Response Deadline: June 30th, 2026
Primary procurement contact — name, title, email, and phone
Additional decision-makers and their departments
City Of Lebanon
The government authority in Lebanon, Missouri is seeking a vendor to provide equipment supplies for an aero landing lift station. Required pump equipment specifications include vertical discharge, continuous operation at 120 °F (48 °C) and intermittent operation at 140 °F (60 °C), with key components such as volute, motor housing, seal plate, and impeller all constructed from cast iron, ASTM A–48. The impeller is designed with 12 vanes in a vortex configuration, dynamically balanced, with hardened 440C stainless steel radial cutters and hardware, as well as Buna–N stainless steel o-rings.
The pump features a double oil-lubricated seal composition involving ceramic, carbon, and silicon elements. The unit requires a 30-foot neoprene-cored cord, sealed to prevent moisture ingress, and single row, oil-lubricated bearings. The motor is a single-phase, permanent split-capacitor type rated at 230 volts, 60 Hz, and 3500 RPM, oil-filled, with built-in overload protection and Class F insulation.
The control panel must include a Type 4X polycarbonate enclosure; a circuit breaker for both pump and control circuits; a definite purpose contactor; three-position toggle switches for HOA and alarm functions; an amber neon pilot run light; and an alternating relay with lead selector switch. All technical questions regarding the RFP must be submitted no later than June 25, 2026.
Analysis generated by Settle AI from the source RFP.
Create a free account to search the full database, filter by your criteria, and have new RFPs matched to your business automatically.