Settle Intelligence
Settle helps teams find, evaluate, and respond to public RFPs. We continuously surface new opportunities, score them against your company strengths, and draft proposal responses so you can focus on the work that wins business.
Pre-bid conference: March 26th, 2026
Question deadline: April 2nd, 2026
Bid opening: May 14th, 2026
New Jersey Transit Corporation
Organization overview and procurement intelligence available on paid plans.
The government authority in New Jersey seeks a vendor to provide solar bus shelter program services, including the construction of a retaining wall system. The retaining wall will be a vertical wall of stepped height, constructed from precast concrete modular facing, tieback units, and installed in a straight configuration on a footing with a foundation drain, appropriate backfill, and coping.
Work includes the placement of non-woven geotextile at the back of the retaining wall unit, extending over the foundation and excavation area as described in the project drawings. A perforated structure foundation drainage pipe must be positioned behind the footing with a minimum gradient of 2 percent, incorporated within a drainage cell encased in geotextile. The contractor will be responsible for placing and compacting coarse aggregate free-draining backfill material in layers not exceeding 8 inches, as well as compacting soil backfill material above the drainage layer up to the finished ground level, also in layers not exceeding 8 inches. All backfill materials must be maintained at optimal or lesser moisture content to achieve required compaction density.
Source attribution
This Settle analysis is based on the issuing organization’s public RFP listing.