Settle Intelligence
Settle helps teams find, evaluate, and respond to public RFPs. We continuously surface new opportunities, score them against your company strengths, and draft proposal responses so you can focus on the work that wins business.
Bid documents available: March 29th, 2026
Non-mandatory pre-bid walkthrough: April 8th, 2026
Technical questions deadline: April 16th, 2026
Bid submission deadline: April 21st, 2026
Bid opening: April 21st, 2026
City Of Pasco
Organization overview and procurement intelligence available on paid plans.
The government authority located in Pasco, Washington is seeking a qualified contractor to provide irrigation system expansion services. The project involves constructing a new irrigation booster pump station to enhance the agency's irrigation systems. This includes the installation of a 30-inch diameter suction pipeline within the agency's right-of-way near the PP6.0 Canal, designed to transfer irrigation water to the new pump station.
The contract further requires the installation of 12-inch, 16-inch, and 24-inch diameter irrigation mains extending along Broadmoor Boulevard, supplementing the existing Low Zone irrigation infrastructure. The booster pump station’s initial configuration calls for two 5 cubic feet per second (cfs) Vertical Turbine Pumps (VTPs) and two 2.5-cfs VTPs, with future capacity for two more 5-cfs VTPs.
Additionally, the project scope includes constructing an 1,800-square-foot concrete masonry unit pump station building featuring sound attenuation measures and a 2-ton bridge crane. The site will be enclosed by an eight-foot-tall perimeter wall. The contract period is one year and a pre-bid meeting is scheduled for April 8, 2026.
Source attribution
This Settle analysis is based on the issuing organization’s public RFP listing.