SUMMARY


Expansion of agency irrigation systems in Pasco, Washington, involving new pump station construction, pipeline installation, and site improvements. Contract duration is one year with a pre-bid meeting set for April 8, 2026.

KEY REQUIREMENTS


BUDGET

Verified

$7,200,000 – $7,900,000

TIMELINE


Bid documents available: March 29th, 2026

Non-mandatory pre-bid walkthrough: April 8th, 2026

Technical questions deadline: April 16th, 2026

Bid submission deadline: April 21st, 2026

Bid opening: April 21st, 2026

QUESTION DEADLINE


April 16th, 2026

Issuing Agency


City Of Pasco

Organization overview and procurement intelligence available on paid plans.

DESCRIPTION


The government authority located in Pasco, Washington is seeking a qualified contractor to provide irrigation system expansion services. The project involves constructing a new irrigation booster pump station to enhance the agency's irrigation systems. This includes the installation of a 30-inch diameter suction pipeline within the agency's right-of-way near the PP6.0 Canal, designed to transfer irrigation water to the new pump station.

The contract further requires the installation of 12-inch, 16-inch, and 24-inch diameter irrigation mains extending along Broadmoor Boulevard, supplementing the existing Low Zone irrigation infrastructure. The booster pump station’s initial configuration calls for two 5 cubic feet per second (cfs) Vertical Turbine Pumps (VTPs) and two 2.5-cfs VTPs, with future capacity for two more 5-cfs VTPs.

Additionally, the project scope includes constructing an 1,800-square-foot concrete masonry unit pump station building featuring sound attenuation measures and a 2-ton bridge crane. The site will be enclosed by an eight-foot-tall perimeter wall. The contract period is one year and a pre-bid meeting is scheduled for April 8, 2026.