See More RFPs

Design Build Exterior Expansion Joint Replacement and Façade Restoration Services

Overview


Construction, Facilities & Maintenance
Washington, District of Columbia, United StatesPosted 27 days agoDeadline: May 11th, 2026

Fit Score


Settle Intelligence

Settle helps teams find, evaluate, and respond to public RFPs. We continuously surface new opportunities, score them against your company strengths, and draft proposal responses so you can focus on the work that wins business.

SUMMARY


The government in Washington, D.C. requires design-build services for exterior expansion joint replacement and façade restoration, including comprehensive construction management and phased execution to maintain ADA access and safety.

KEY REQUIREMENTS


BUDGET

Estimate

$500,000 – $2,000,000

CONTRACT DURATION


36 months

TIMELINE


RFP Release Date: April 10th, 2026

RFP Pre-Proposal Conference: April 22nd, 2026

RFP Questions Due Date: April 24th, 2026

RFP Response Due Date: May 11th, 2026

QUESTION DEADLINE


April 24th, 2026

Issuing Agency


Washington Convention And Sports Authority

Organization overview and procurement intelligence available on paid plans.

DESCRIPTION


The government authority in Washington, D.C. seeks a vendor to deliver design-build exterior expansion joint replacement and façade restoration services. The comprehensive project includes design, acquiring permits and licenses, subcontractor coordination, scheduling, management of requests for information, substitutions and change requests, addressing existing conditions, specifying materials and trades, ensuring safety and public access, conducting on-site inspections, restoration and site cleanup, construction material storage and removal, submitting closeout documentation, as well as final testing and detailing.

Construction will be conducted in phased zones to maintain safe pedestrian circulation, uphold ADA compliance, and ensure uninterrupted access to buildings and public areas throughout all work stages. The selected contractor is responsible for all hoisting, scaffolding, and rigging required for the tasks.

Scope of work involves primary installation of Emseal–Roof Joint assembly in the structural slab opening per manufacturer’s guidelines, removing deteriorated expansion joints and backer material from vertical expansion joints, thoroughly cleaning joint faces for optimal adhesion, verifying uniform joint gaps, and ensuring substrates are free of defects. The contractor should eliminate any excess epoxy or silicone from the surrounding façade panels and properly dispose of debris.

Source attribution

This Settle analysis is based on the issuing organization’s public RFP listing.

Similar RFPs


    Design Build Exterior Expansion Joint Replacement and Façade Restoration Services | Settle RFP Hunter